Special equipment rental in Moscow and Moscow Region +7(495) 790-34-04
RUEN
+7(495) 790-34-04Mon–Fri 9:00 AM – 8:00 PM · Sat–Sun 10:00 AM – 6:00 PM
Request a quote We call back in 10 minutes, pick the right machine and fix the price MosKran is a local Moscow company (not international). An English-speaking operator will reply as soon as one is available — please allow a little waiting time.

Truck crane and rigger services

MosKran provides rigger services in Moscow and Moscow Region.

Rigger services in Moscow 13 000 RUB/shift

Using professional services when working with crane equipment is the key to successful execution of a project of any complexity. By contacting our company, you can be sure that we will provide you with only qualified specialists who have undergone professional training and have extensive practical experience in working with crane equipment and slinging. In addition to professional knowledge about load characteristics and slinging rules depending on external conditions, our riggers are knowledgeable in life safety and first aid.

Order now by phone +7(495) 790-34-04.

Minimum shift is 7 working hours.

You can also order the services of:

Rigger services in MoscowLOADERS AND Rigger services in MoscowRIGGERS

6 500 RUB/shift 6 500 RUB/shift

Attentiveness, accuracy and responsibility help our employees perform their work effectively.

According to regulatory acts and other governing documents, before starting work a rigger must undergo a briefing covering the characteristics of the load and the equipment he will work with. In addition, during the briefing the rigger's knowledge is checked, such as:

During work, the rigger must follow the instructions and commands of his immediate supervisor and be guided by the job description.

This instruction regulates the rigger's actions regarding work with the load, slings and load-gripping elements. In particular, during slinging, the rigger must follow approved schemes. Before moving a load, its actual weight must be checked in advance to ensure it matches the marking. Loads must be tied in such a way as to avoid knots or twists that could affect the transportation process or cause damage to the packaging or containers.

If the load or its packaging has sharp, cutting edges, pads must be used during slinging to prevent damage to the slings. In winter or in aggressive environments, before lifting, make sure the load can freely break away from the ground (no ice crust or other adhesion to the ground). During transportation, the rigger must accompany the load along its entire path and ensure that there are no people or foreign objects in the movement zone that could cause the load to catch. If the load is long or bulky, it must be transported using special tag lines that prevent its unauthorized rotation.

Another important rule to be observed during slinging is simultaneous hooking of the load in at least two places. If the load is equipped with special slinging fittings, hooking must be done so as to use all of these fittings. If a double-horned hook is used to move the load, hooking must be done so that each horn of the hook is loaded evenly. If the load design does not allow using all legs of a multi-leg sling, they must be secured so that they do not dangle during transportation, creating a danger of catching or damaging surrounding objects.

Get a quote

Leave a request — we call back in 10 minutes, pick the crane and fix the price.

MosKran is a local Moscow company (not international). An English-speaking operator will reply as soon as one is available — please allow a little waiting time.

+7(495) 790-34-04 +7(495) 960-98-10 +7(495) 960-70-03

Request a quote